GH-PPA-11

Savanna Solar 400 MW Solar PV Project, Kusawgu

Savanna Solar Limited · Solar PV · 400.00 MW · Kusawgu, Northern Region, Ghana

Summary

A 400 MW solar PV plant in Kusawgu, Northern Region, supplying ECG under a 25-year energy-only PPA signed 11 June 2013 (extendable by 5 years). A flat PURC feed-in tariff of 22.6372 US cents/kWh applies for the first 10 years, renegotiated within a PURC range thereafter, with a take-or-pay obligation.

Key terms

Offtaker
Electricity Company of Ghana (ECG)
Signing date
2013-06-11
Financial close
Not stated
Commercial operation
Within 3 years of PPA signing (i.e. by June 2016) Source: cl. 15.1.17 (p. 15)
Contract end
25 years from the Effective Date (extendable by 5 years by mutual consent) Source: cl. 2.1; 2.2 (p. 8)
Contract duration
25 years
Contract status
Active
Project status
Not recorded
Tariff structure
Energy-only
Capacity charge
None (no capacity payment) Source: Sch. 1 (p. 26)
Energy charge
USD 0.226372/kWh
Key risk features
Take-or-pay
Indexation formula
Fixed USD rate for years 1-10; year-11 reset negotiated within a PURC range with a floor at the original rate, applying for the remaining 15 years.
Project overview
Expected annual generation
Not in contract Source: cl. 6.1-6.2 (p. 9)
Commercial operation date (COD)
Within 3 years of PPA signing (i.e. by June 2016) Source: cl. 15.1.17 (p. 15)
PPA expiry
25 years from the Effective Date (extendable by 5 years by mutual consent) Source: cl. 2.1; 2.2 (p. 8)
Contract term (years)
25 (extendable by 5 years by mutual consent; year-to-year thereafter) Source: cl. 2.1; 2.2; 20.2.1 (p. 8; 20)
Contracting parties
Transmission service provider
Ghana Grid Company (GRIDCo) Source: cl. 4.2; 15.1.16 (p. 8; 15)
Government support entity
Not addressed in the PPA; may be addressed in related documents. Recital: the seller will need the Buyer's and the Ministry's assistance to obtain political risk insurance. Source: Recitals (p. 2)
Project sponsors / shareholders
Not stated in the PPA
Ultimate beneficial owner(s)
Not in contract
Commercial terms
Contract type
Energy-Only PPA Source: cl. 8.1; Sch. 1 (p. 10; 26)
Contracted capacity (MW)
400 Source: 'Connected Capacity' definition (p. 3)
Tariff currency
US Dollars (invoiced and payable in USD) Source: cl. 8.6 (p. 11)
Tariff structure summary
Single flat energy rate of US 22.6372 cents/kWh for the first 10 years of operation; price then renegotiated within a PURC range for the remaining 15 years, with a floor at the initial rate. The rate is labelled a PURC Feed-In-Tariff, and a FIT framework is a condition precedent to effectiveness. Source: Sch. 1; cl. 3.1(e); 'Feed-In-Tariff' definition (p. 26; 8; 4)
Capacity charge
None (no capacity payment) Source: Sch. 1 (p. 26)
Energy charge
US 22.6372 cents/kWh on metered energy delivered (Ei = supply meter reading less compensator consumption) Source: Sch. 1; Sch. 3 para 3 (p. 26; 30)
Tariff escalation mechanism
No escalation for 10 years. From year 11, price renegotiated within PURC range; cannot fall below the initial rate. Source: Sch. 1 para 2 (p. 26)
Indexation: inflation
No Source: Sch. 1 (p. 26)
Indexation: foreign exchange
No Source: cl. 8.6 (p. 11)
Indexation: fuel price
No
Indexation: none / fixed tariff
Yes Source: Sch. 1 (p. 26)
Indexation: other
No
Summary of indexation methodology
Fixed USD rate for years 1-10; year-11 reset negotiated within a PURC range with a floor at the original rate, applying for the remaining 15 years. Source: Sch. 1 (p. 26)
Government and consumer exposure
Take-or-pay obligation
Yes Source: cl. 4.3 (p. 8)
Take-or-pay details
ECG must buy all energy produced from COD and pay the tariff for energy produced under the Seller's production program but not taken. Source: cl. 4.3 (p. 8)
Minimum offtake requirement
Yes Source: cl. 4.3 (p. 8)
Minimum offtake details
100% of energy produced (must-run facility); undelivered-but-available energy paid as deemed energy. Source: cl. 4.3; 'MUST RUN Facility' definition (p. 8; 5)
Government guarantee
No
Letter of support
No
Foreign exchange protection mechanism
Yes Source: cl. 8.6 (p. 11)
Foreign exchange protection details
Tariff invoiced and payable in US dollars, so the seller bears no cedi depreciation risk. Source: cl. 8.6 (p. 11)
Other government commitments
Offtaker (not Government): ECG must post a USD 15 million standby letter of credit or bank guarantee from an international bank, stepping down to about 2 months of payments after construction. Recital: seller will need Buyer and Ministry assistance to obtain World Bank political risk insurance. Source: cl. 8.8; Recitals (p. 11; 2)
Fiscal incentives and non-tariff government support
VAT not charged on energy invoiced. ECG builds the connection point and transmission lines to the substation at its own cost; GRIDCo solely responsible for the line to the NITS. ECG receives 50% of any REC/SREC sale proceeds. No tax holiday or stabilization clause found. Source: cl. 8.9; 5.2; 15.1.16; 30.2 (p. 11; 9; 15; 23)
Risk allocation
Fuel supply risk borne by
Not applicable
Resource availability risk borne by
Seller Source: cl. 7.2; 19.1.1 (p. 10; 19)
Foreign exchange risk borne by
Offtaker Source: cl. 8.6 (p. 11)
Transmission and grid availability risk borne by
Offtaker Source: cl. 4.2; 4.3; 5.2; 15.1.16 (p. 8; 9; 15)
Summary of key risk allocation provisions
ECG carries offtake, FX and grid risk: it must buy all output (and pay for energy not taken), pays in USD, and builds the connection and lines. Seller carries resource and performance risk. Change in law is defined but not allocated. Fuel risk not applicable (solar). Source: cl. 4.3; 5.2; 8.6; 15.1.16; 19.1.1 (p. 8-19)
Performance obligations
Availability requirement
No availability percentage. Seller is in default if energy supplied over any 30 continuous days, or over the year, is below 50% of its Annual Energy Production Program. Source: cl. 19.1.1 (p. 19)
Performance guarantee
No Source: cl. 7.2 (p. 10)
Summary of performance obligations
Seller warrants sufficient capacity for its own production program, reports monthly/annually, delivers 3-phase power at 161 kV within grid code limits, and maintains 0.9 power factor. Default threshold is 50% of programmed output. Source: cl. 6; 7; 15.1; 19.1.1 (p. 9-15; 19)
Curtailment compensation
Applicable Source: cl. 4.3; 15.2.8 (p. 8; 16)
Force majeure, default and termination
Force majeure provisions
Broad definition incl. war, riots, natural events, fuel shortage and government action or inaction (except payment default). Obligations suspended while FM continues; no payment relief or termination payment specified. Lack of funds excluded. Source: cl. 17 (p. 17-18)
Termination compensation: seller default
Not stated Source: cl. 19.3.2 (p. 19)
Termination compensation: buyer default
Not stated Source: cl. 19.3.2; 20.1.3 (p. 19-20)
Termination compensation: political force majeure
Not stated
Summary of termination compensation framework
No termination payment formula in the PPA. Either party may claim losses from the other's default, including lost profit (cl. 19.3.2). Termination does not relieve accrued liabilities or ECG's duty to pay for energy supplied (cl. 20.1.3). The plant stays with the seller after expiry or termination (cl. 20.2.3). Source: cl. 19.3.2; 20.1.3; 20.2.3 (p. 19-20)
Dispute resolution
Governing law
Laws of Ghana Source: cl. 29 (p. 23)
Dispute resolution: negotiation / mediation
Yes Source: cl. 22.1 (p. 20)
Dispute resolution: expert determination
No
Dispute resolution: arbitration
Yes Source: cl. 22.2 (p. 20-21)
Dispute resolution: court proceedings
No
Dispute resolution: other
No
Arbitration seat
London, England Source: cl. 22.2.3 (p. 21)
Applicable arbitration rules
London Court of International Arbitration (LCIA); 3 arbitrators; English language Source: cl. 22.2.1-22.2.3 (p. 20-21)
Amendments
Number of amendments executed
Not in contract (base PPA only; no amendments in the set provided) Source: cl. 24.1 (p. 21)