Safi Sana Ghana Limited · Waste-to-Energy · 0.10 MW · Ashaiman, Ashaiman Municipality, Greater Accra Region, Ghana

Summary

A 100 kW waste-to-energy (biogas CHP) plant in Ashaiman, supplying ECG under a 15-year energy-only PPA (the signing date was left blank in the executed copy; year 2016). A flat feed-in tariff of 17.51 US cents/kWh applies for 10 years from commercial operation, 80% USD-denominated, with a take-or-pay obligation.

Key terms

Offtaker
Electricity Company of Ghana (ECG)
Signing date
—
Financial close
—
Commercial operation
—
Contract end
—
Contract duration
15 years
Contract status
Active
Tariff structure
Energy-only
Capacity charge
—
Energy charge
USD 17.5100/kWh
Key risk features
Take-or-pay Currency indexation Change-in-law protection
Indexation formula
Feed-In-Tariff fixed at 17.51 US cents/kWh from commercial operation to the 10th anniversary; thereafter reset every two years with PURC approval, no stated formula. 80% of the tariff is USD-denominated and paid in Cedis at a quarterly Hedged Exchange Rate filed with PURC; the remaining 20% local-cost component is billed and paid directly in Cedis.