GH-PPA-DRAFT-10
Safi Sana 100 kW Waste-to-Energy (Biogas CHP) Plant, Ashaiman
Safi Sana Ghana Limited · Waste-to-Energy · 0.10 MW · Ashaiman, Ashaiman Municipality, Greater Accra Region, Ghana
GH-PPA-DRAFT-10
Safi Sana 100 kW Waste-to-Energy (Biogas CHP) Plant, Ashaiman
Safi Sana Ghana Limited · Waste-to-Energy · 0.10 MW · Ashaiman, Ashaiman Municipality, Greater Accra Region, Ghana
Summary
A 100 kW waste-to-energy (biogas CHP) plant in Ashaiman, supplying ECG under a 15-year energy-only PPA (the signing date was left blank in the executed copy; year 2016). A flat feed-in tariff of 17.51 US cents/kWh applies for 10 years from commercial operation, 80% USD-denominated, with a take-or-pay obligation.
Key terms
- Offtaker
- Electricity Company of Ghana (ECG)
- Signing date
- —
- Financial close
- —
- Commercial operation
- —
- Contract end
- —
- Contract duration
- 15 years
- Contract status
- Active
- Tariff structure
- Energy-only
- Capacity charge
- —
- Energy charge
- USD 17.5100/kWh
- Key risk features
- Take-or-pay Currency indexation Change-in-law protection
- Indexation formula
- Feed-In-Tariff fixed at 17.51 US cents/kWh from commercial operation to the 10th anniversary; thereafter reset every two years with PURC approval, no stated formula. 80% of the tariff is USD-denominated and paid in Cedis at a quarterly Hedged Exchange Rate filed with PURC; the remaining 20% local-cost component is billed and paid directly in Cedis.